4.6 Installation of Control Panel(Console,Box and Cabinet)
4.6.1 Quantity for acceptance inspection.
1 Control panel(console,box and cabinet)installed in rows shall be inspected 100%.
2 Control panel(console,box and cabinet)installed separately shall be inspected 30% randomly.
3 Other installation items shall be inspected 20% randomly.
4.6.2 Installation of control panel.
1 Manufacture and installation inspection and acceptance of control panel(console,box and cabinet)and equipment base are detailed in Table 4.6.2-1.
Table 4.6.2-1 Manufacture and installation of control panel(console,box and cabinet)and equipment base
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_180.jpg?sign=1739281116-kpfwlpLg0YsiN7DeAtMYewWnsUv0ysyw-0-34c2823a6f7851b2fd04e9589c04bf43)
Table 4.6.2-1(Continued)
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_181.jpg?sign=1739281116-eo7fRQhQPVvFVBt6GUH50LYqT7Zur8KM-0-1d5cfa7bd2f1bd2688cccb8e0d99eaf8)
2 Installation inspection and acceptance of control panel(console,box and cabinet)and in rows are detailed in Table 4.6.2-2.
Table 4.6.2-2 Installation of control panel(console,box and cabinet)in rows
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_182.jpg?sign=1739281116-r4Xwxdg1JpW76gvMfehybr59H6Z5Kxpx-0-19e5485cd5f3ca88daa5d7557e67d378)
3 Installation inspection and acceptance of individual panel(console,box and cabinet)are detailed in Table 4.6.2-3.
Table 4.6.2-3 Installation of individual panel(console,box and cabinet)
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_183.jpg?sign=1739281116-4rOMb4ls99i9XO4By4TOBhAAeLGfvcxh-0-6176413f722252efb7566c989565e828)
4 Installation inspection and acceptance of thermostat,protective box and connection box are detailed in Table 4.6.2-4.
Table 4.6.2-4 Installation of thermostat,protective box and connection box
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_184.jpg?sign=1739281116-Y6IR5WnDYb65YHlEbsla9dmZ5TMcEyZp-0-07ffb90b53f478c4d6f339feb55423ae)
Table 4.6.2-4(Continued)
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_185.jpg?sign=1739281116-i7SXSK5D8XlcKFzR53y9WlFz1og9gxFG-0-2502f8148c02e4a24b3df3ef3983bea0)
4.6.3 Installation of instruments on panel.
1 Installation inspection and acceptance of instrument on panel are detailed in Table 4.6.3-1.
Table 4.6.3-1 Installation of instruments on panel
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_186.jpg?sign=1739281116-mbsH2MGgQoSRK8wZJItMh6up9BgMprki-0-50962dfd3b178284c2cabfaec165b264)
2 Installation inspection and acceptance of distributed control system are detailed in Table 4.6.3-2.
Table 4.6.3-2 installation of distributed control system
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_187.jpg?sign=1739281116-9DbChLF8YB4e8xOYOF5A0wHlyMKk2wT4-0-031e189392a56266a79685eb7628029a)
3 Installation inspection and acceptance of digital display instrument are detailed in Table 4.6.3-3.
Table 4.6.3-3 Installation of digital display instrument
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_188.jpg?sign=1739281116-rcnbl8QfYShdGup4YQYK2DCY42dcEV47-0-9edd5f5de1bf765b33db2581c2565c8e)
4 Installation inspection and acceptance of recording instrument are detailed in Table 4.6.3-4.
Table 4.6.3-4 Installation of recording instrument
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_189.jpg?sign=1739281116-Sp9RyF9hM71PTiEQQ51kqGA4fKddBDtb-0-3c7f76cd2c9d8f81db25c1fe13518993)
5 Inspection and acceptance of survey instrument are detailed in Table 4.6.3-5.
Table 4.6.3-5 Survey instrument
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_190.jpg?sign=1739281116-XFspyBSQBQ5zr5OwvMwBRxLvEV63MLq2-0-d0680736f5d1f16b7b9ce19c2a3f4e6f)
6 Installation inspection and acceptance of flashing-signal alarm devices and large screen display are detailed in Table 4.6.3-6.
Table 4.6.3-6 Installation of flashing-signal alarm devices and large screen display
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_191.jpg?sign=1739281116-eGTrDObLoWWnXoBJoD0qHfq3V5if6I31-0-02d9c6b691ac9a532ad2ec5b879ce74b)
7 Installation inspection and acceptance of the control system for PLC are detailed in Table 4.6.3-7.
Table 4.6.3-7 Installation of the control system for PLC
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_192.jpg?sign=1739281116-qgdteQ0vBNtUiRnp2csM315MWe62sn8e-0-0d39942be2ae71e0c05637a22da7cf7b)